SIRA-Compliant CCTV Installation for Al Masaood Bergum in Dubai

Client Overview

 

Client: Al Masaood Bergum

Industry: Real Estate Development & Construction

Location: Dubai Investment Park, Dubai

Site Type: Warehouse and Office Facility

Project Requirement

Al Masaood Bergum required a fully SIRA-compliant CCTV surveillance system for their warehouse and office facility at Dubai Investment Park. The objective was to ensure regulatory compliance while achieving complete security coverage across open warehouse areas and office spaces.

Challenges & Execution

The warehouse’s open layout presented multiple infrastructure challenges, including:

 

  • Extensive civil and conduit work

  • Pulling fiber connections from multiple IDF locations to the MDF room

  • Routing backbone cabling through manholes and external wall conduits

  • Designing and installing custom camera poles for optimal coverage

 

Keenteq successfully engineered and executed a robust fiber backbone network, ensuring reliability and long-term scalability.

Scope of Work

  • SIRA certification–compliant CCTV system design and installation

  • Detailed site survey and camera calculation

  • Installation of approximately 168 IP CCTV cameras

  • NVR setup and configuration

  • Videoguard system integration for SIRA connectivity

  • Complete BOQ preparation and execution

KeenTeQ’s Solution

Keenteq conducted a comprehensive site visit and SIRA guideline assessment to determine the exact surveillance requirements.

 

As per SIRA regulations:

 

  • Only IP cameras were permitted

  • Cameras installed above 4 meters required varifocal lenses (fixed lens cameras are allowed only below 4 meters)

 

Based on these specifications, Keenteq designed a solution using varifocal IP cameras positioned strategically across the site to ensure full coverage and compliance.

 

A complete NVR and Videoguard setup was implemented to enable seamless integration with the SIRA monitoring system. A detailed BOQ was prepared, and after technical discussions and negotiations, the project was awarded to Keenteq.

Outcome & Results

  • Complete installation executed 100% as per SIRA compliance

  • SIRA inspection conducted

  • Approval received during the second inspection

  • Fully operational and compliant surveillance system across the facility

Client Feedback

The client expressed satisfaction with the project execution, technical approach, and successful SIRA approval.